• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar

WRCR AM 1700

RADIO UNSCRIPTED!

Studio Hotline : 845-429-1700

  • Home
  • News
  • Local Weather
  • Schedule
  • Events
  • Advertise
  • About WRCR
  • Contact
  • Payment

Western Highway Bridge Replacement Project Delayed, May Not Re-open until April 2022

November 30, 2021 by Jeff Lewis

A highly-traveled roadway from Orangetown to Clarkstown will remain shut down near the border of the two towns, possibly until the spring. The bridge on Western Highway between Pineview Road and Green Road is being replaced. Clarkstown supervisor George Hoehmann says the project hit supply chain issues and may not be done until April…

Orangetown supervisor Teresa Kenny says the roadway is a popular route for those traveling between West Nyack and Blauvelt, and the delays have become quite an inconvenience…

The Western Highway bridge was originally supposed to re-open in early January. Over in Ramapo, supervisor Michael Specht says the new College Road Thruway overpass re-opened last week, ahead of schedule…

The College Road bridge was the final portion of a $30.8 million infrastructure improvement project to replace three bridges in Ramapo. The Scotland Hill Road bridge opened November 1st, and the Hungry Hollow Road bridge was replaced and re-opened one year ago.

Filed Under: News

Primary Sidebar

Search WRCR

Listen Live


 

Breaking News Video


 
 

NYS Thruway Traffic Cameras

 
 

Weather


 
 

Links

  • Fire and Emergency
  • Local Maps
  • Rockland County Government
  • New York State
  • Tourism
  • Public Transportation
  • NJ Transit
  • NYC Transit
  • Moviefone
  • Parks and Recreation
  • Thruway Traffic

 
 

  • Facebook
  • Twitter

Copyright © 2025 · Metro Pro on Genesis Framework · WordPress · Log in